ML ConstructionProjectsDiscuss your project
← All projects
Excavated basement with perimeter shoring, crane and excavation plant
Excavation & shoring
Basement formwork, reinforcement and propping around the crane
Basement formwork
Reinforcement and formwork around a building core opening
Core & reinforcement
Construction crew placing concrete over a reinforced slab
Concrete placement
Concrete floor, columns and soffit before internal fitout
Concrete structure
Concrete facade and curved slab edge behind scaffolding
External structure
Metal stud partitions and overhead services during fitout
Internal framing
Blockwork partitions and overhead pipework during construction
Blockwork & services
Window frame, sill detailing and adjacent wall framing
Window interfaces
Service conduits and trench beside a louvred building enclosure
External services